READY TO CHARGE IN 8 WEEKS OR LESS

Mobile Fast DC Charging Stations That
Work When The Grid Fails


  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

Off-grid, no-installation EV charging for commercial fleets. Avoid blackouts, eliminate wait times, and start charging on day one.


  • No permits, surveys, or construction – Deploy in 8 weeks vs. 6-12 months

  • 100% grid-independent – Never lose charging during blackouts

  • Mobile and relocatable – Move with your fleet or operations

  • Level 2 & Fast DC Level 3 – Up to 80 miles per hour of charge

Get Pricing & Free Consultation

Contact us using the form below or call us at 877-973-5338.

Trusted By Organizations That Can't Afford Downtime

With electric vehicles, it’s all about the charging.

Imagine the peace of mind knowing your business has guaranteed access to level 2 or 3 (fast DC) stations that are not dependent on the grid.

Trucks, skids, and trailers that are mobile, rapidly deployable, and ready to use immediately.


Commercial-grade chargers for all vehicle classes.


No surveys, permits, installation, construction or waiting in line for approval.

icon_template

 

 Units run on alternative fuels- not diesel or conventional gasoline

  

  

 

What does reliable, uninterrupted fast charging mean to your business or organization's goals?

When the loss of charging stations or stranded EVs is simply not an option...ever


  • Commercial fleets
  • Automotive testing tracks
  • Automotive proving grounds
  • School buses
  • Farm equipment
  • Heavy equipment
  • Last Mile / Final Mile
  • Delivery companies
  • Trucking
  • Temporary charging solutions



  • Remote locations
  • Special events
  • Hubs / Depots
  • Regulatory or state-level mandates
  • Government agencies
  • Emergency backup
  • City or state evacuation plans
  • Energy resilience programs


When the loss of power to charging stations or stranded EVs simply isn't an option...ever

  • Commercial fleets
  • Automotive testing tracks / proving grounds
  • School buses
  • Farm equipment
  • Heavy equipment
  • Last Mile / Final Mile
  • Delivery companies
  • Trucking
  • Temporary charging solutions


  • Remote locations
  • Special events
  • Hubs / Depots
  • Regulatory or state-level mandates
  • Government agencies
  • Emergency backup
  • City or state evacuation plans
  • Energy resilience programs


Why Mobile Beats Traditional Charging Stations

Deployed 6X Faster

8 weeks or less vs. 6-12 months for traditional stations. No permits, surveys, or construction required.

icon_template

Grid-Independent Power

Runs on renewable propane. Keep charging during blackouts, brownouts, and peak demand periods.

icon_template

Goes Where You Go

Fully mobile on trucks, trailers, or skids. Relocate if you move operations or expand to new sites.

Lower Total Cost

Eliminate engineering, construction, and installation costs. No utility demand charges or interconnection fees.

Clean Alternative Fuel

Powered by green and renewable propane – not diesel or conventional gasoline. Reduced emissions.

icon_template

Flexible and Scalable

Compatible with all EV classes. Start with one unit, add more as your fleet grows. Optional buyback program.

Buyback program


Options to trade in for alternative EVSE solutions in the future


back arrow icon

Mobile Vs Traditional Charging Station

Mobile Traditional
No surveys or permits Surveys and permits required
No installation needed Installation required
No engineering or construction costs Substantial engineering and construction costs
8 weeks or less lead time 6 months to 1 year lead time
Immune to blackout and brownouts Goes down when electrical grid does
Powered by green propane and renewable propane Powered by electric
Mobile or rapidly deployable Stationary and attached to property
Easily transport if you move or relocate Stays with new property owner

Scalable fast chargers for all vehicle classes

Scalable mobile chargers for all vehicle classes

Rapid all the way around

The future of EVs is coming fast. Are you ready?


Mobile EV stations are fast to set up, requiring nothing more than the unit itself. They're mobile and ready to move where and when you need them. And they can power up your vehicles with level 2 or level 3 maximum DC fast charging.


These units have a quick lead time, are an incredible value, and have the most options and configurations.


Explore out how you can use these units to meet your business and organizational goals.



Fleet vehicle lease or purchase (EVs, gas-powered, and hybrid), custom upfits/outfits, fleet electrification programs, extended vehicle warranties, discount fuel/charging cards, and safety and maintenance programs are also part of the solutions we offer.

LET'S CHAT
  • An electric car is being charged at a charging station.

    Slide title

    Write your caption here
    Button
  • A 3d rendering of a charging station for electric vehicles.

    Slide title

    Write your caption here
    Button
  • A white truck with a generator attached to it.

    Slide title

    Write your caption here
    Button

Ready to Eliminate Charging Downtime?

Get a custom quote for your fleet. Speak with a specialist about deployment timeline, pricing, and financing options.

We can help with commercial mobile EV charging station quotes! Please fill out and we'll be in touch shortly.